Our move-in date of December 15th (ish) is fast approaching and the work is moving along very well. Exterior is completely done (minus small paint touch-ups). The garage is totally done. The tile's are all done inside, grouted and everything. The hardwood arrived yesterday and I think it goes down tomorrow (starting at least). Cabinets arrive on Monday to be installed in the kitchen/bathrooms/laundry room. Then it's electrical finishing (installing outlets/switches) and the plumbing (toilets/sinks/taps). The railings will go in next week I assume, then it's really the small details before we get in. It'll be a very merry Christmas this year...or should I say "Murray Christmas"....no...no I shouldn't...that's so 1984!
The landscapers were there today doing their thing, framing for concrete paths and levelling the front and back yards. Moving our rhodo's (I can't believe they survived...) to their new locations.
All is moving swimmingly...stay tuned for the last entry and the move-in pics!
the pics above are of the suite bathroom tiles, the master ensuite shower, the kids bathroom tiles and the crazy looking fireplace.
later all
Marc, Jen, Madeleine and Cash
No comments:
Post a Comment